APPENDIX 8-1

 

FAULT TREE ANALYSIS


Figure A8-1        Cold Catastrophic Failure of LPG Vessel

1

 

 

 

 

 

 

 

 

 

 

 

 

Cold catastrophic failure of LPG vessel

 

 

 

 

 

 

 

 

 

 

 

 

3.6 x 10-7

 

 

 

 

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

3

 

 

 

 

 

 

 

 

 

 

Spontaneous failure

 

External event failure

 

 

 

 

 

 

 

 

 

 

1.8 x 10-7 x 2

(2 vessels)

 

0

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

 

 

 

 

 

 

 

 

 

Earthquake of Modified Mercali Intensity (MMI) VII

 

Probability of failure due to earthquake

 

 

 

 

 

 

 

 

 

 

1.0 x 10-5

 

0

 

 

 

 

 

 

 

 

 


Figure A8-2        Cold Catastrophic Failure of Road Tanker

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cold catastrophic failure of LPG road tanker

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.7 x 10-7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

3

 

 

 

 

 

 

 

 

 

 

Spontaneous failure

 

 

 

Failure due to earthquake

 

 

 

 

 

 

 

 

 

 

2.7 x 10-7

 

 

 

0

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

6

 

7

 

8

 

 

 

 

 

 

Spontaneous failure

 

Portion of time on site

 

Earthquake of Modified Mercali Intensity (MMI) VII

 

Probability of failure due to earthquake

 

Portion of time on site

 

 

 

 

 

 

2.0 x 10-6

 

0.133

 

1.0 x 10-5

 

0

 

0.133

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Figure A8-3        Cold Partial Failure of LPG Vessel

1

 

 

 

 

 

 

 

 

 

 

 

 

Cold partial failure of LPG vessel

 

 

 

 

 

 

 

 

 

 

 

 

1.0 x 10-5

 

 

 

 

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

3

 

 

 

 

 

 

 

 

 

 

Spontaneous failure

 

External event failure

 

 

 

 

 

 

 

 

 

 

5.0 x 10-6 x 2

(for 2 vessels)

 

1.0 x 10-7

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

 

 

 

 

 

 

 

 

 

Earthquake of Modified Mercali Intensity (MMI) VII

 

Probability of failure due to earthquake

 

 

 

 

 

 

 

 

 

 

1.0 x 10-5

 

0.01

 

 

 

 

 

 

 

 


Figure A8-4        Cold Partial Failure of Road Tanker

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cold partial failure of LPG road tanker

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.7 x 10-7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

3

 

 

 

 

 

 

 

 

 

 

Spontaneous failure

 

 

 

Failure due to earthquake

 

 

 

 

 

 

 

 

 

 

6.7 x 10-7

 

 

 

0

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

6

 

7

 

8

 

 

 

 

 

 

Spontaneous failure

 

Portion of time on site

 

Earthquake of Modified Mercali Intensity (MMI) VII

 

Probability of failure due to earthquake

 

Portion of time on site

 

 

 

 

 

 

5 x 10-6

 

0.133

 

1.0 x 10-5

 

0

 

0.133

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Figure A8-5        Guillotine Failure of Liquid-Inlet Pipework

1

 

 

 

 

 

 

 

 

 

 

 

 

Guillotine failure of liquid filling line to vessel

 

 

 

 

 

 

 

 

 

 

 

 

4.8 x 10-8

 

 

 

 

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

3

 

 

 

 

 

 

External event failure

 

 

 

 

 

Spontaneous failure

 

 

 

 

 

 

1.3 x 10-8

 

 

 

 

 

3.5 x 10-8

 

 

 

 

 

 

AND

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

6

 

7

 

8

 

9

 

10

Earthquake of Modified Mercali Intensity (MMI) VII

 

Probability of failure due to earthquake

 

Proportion of time spent in filling

 

Spontaneous failure

 

Excess Flow Valve failure

 

Length

 

Proportion of time spent in filling

1.0 x 10-5

 

0.01

 

0.133

 

1.0 x 10-6

 

0.13 per demand

 

2

 

0.133


Figure A8-6        Guillotine Failure of Liquid Supply Line to Dispenser

1

 

 

 

 

 

 

 

 

 

 

Guillotine failure of liquid filling line to dispenser

 

 

 

 

 

 

 

 

 

 

1.0 x 10-7

 

 

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

3

 

 

 

 

 

 

External event failure

 

 

 

Spontaneous failure

 

 

 

 

 

 

1.0 x 10-7

 

 

 

1.5 x 10-9

 

 

 

 

 

 

AND

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

6

 

7

 

8

 

 

Earthquake of Modified Mercali Intensity (MMI) VII

 

Probability of failure due to earthquake

 

Spontaneous failure

 

Length

 

3 Shut Off Valve failure

 

 

1.0 x 10-5

 

0.01

 

1.0 x 10-6 per metre

 

15

 

1.0 x 10-4

 

 


Figure A8-7        Failure of Dispenser

1

 

 

 

 

 

 

 

 

 

 

 

 

Dispenser failure

 

 

 

 

 

 

 

 

 

 

 

 

5.6 x 10-6

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

3

 

 

 

 

 

 

Failure of dispenser

 

 

 

 

 

Failure to isolate

 

 

 

 

 

 

2.8 x 10-3

 

 

 

 

 

2 x 10-3

 

 

 

 

 

 

AND

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

5

 

 

 

6

 

7

 

 

 

 

Failure of dispenser1

 

No. of dispenser

 

 

 

Failure to close manual valve

 

Pressure Relief Valve failure

 

 

 

 

3.5 x 10-4

 

8

 

 

 

0.2

 

0.01

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

9

 

 

 

 

 

 

 

 

 

 

Spontaneous failure of dispenser

 

Failure due to vehicle collision

 

 

 

 

 

 

 

 

 

 

1.0 x 10-6

 

3.5 x 10-4

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

11

 

 

 

 

 

 

 

 

 

 

Vehicle collision

 

No. of taxi per year

 

 

 

 

 

 

 

 

 

 

1.0 x 10-9

 

350,400

 

 

 

 

 

 

 

 

 


Figure A8-8        Failure of Flexible Hose during Loading to Underground Vessel

1

 

 

 

 

 

 

 

 

 

 

 

 

Failure during loading

 

 

 

 

 

 

 

 

 

 

 

 

6.6 x 10-10

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

3

 

4

 

 

 

 

 

 

 

 

Leakage during loading

 

No. of filling per year

 

Failure to isolate

 

 

 

 

 

 

 

 

6.6 x 10-6

 

584

 

1.7 x 10-7

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

6

 

 

 

7

 

8

 

 

Hose disconnection

 

 

 

Hose misconnection

 

 

 

Drive away failure

 

Spontaneous failure

 

 

4.0 x 10-7

 

 

 

6.0 x 10-6

 

 

 

5.2 x 10-8

 

1.8 x 10-7

 

 

AND

 

 

 

AND

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

10

 

11

 

12

 

13

 

14

 

 

Hose disconnection

 

Driver fail to rectify the problem

 

Hose misconnection

 

Driver fail to rectify the problem

 

Tanker drives away

 

Breakaway Coupling failure

 

 

2 x 10-6

 

0.2

 

3 x 10-5

 

0.2

 

4 x 10-6

 

0.013

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Figure A8-9        Failure of Flexible Hose during Loading to Vehicle Vessel

1

 

 

 

 

 

 

 

 

 

 

 

 

Failure during loading

 

 

 

 

 

 

 

 

 

 

 

 

7.1 x 10-8

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

3

 

4

 

 

 

 

 

 

 

 

Leakage during loading

 

No. of filling per year

 

Failure to isolate

 

 

 

 

 

 

 

 

1.2 x 10-6

 

350,400

 

1.7 x 10-7

 

 

 

 

 

 

 

 

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

6

 

 

 

7

 

8

 

 

Hose disconnection

 

 

 

Drive away failure

 

 

 

Spontaneous failure

 

Vehicle collision

 

 

4.0 x 10-7

 

 

 

8.0 x 10-7

 

 

 

1.5 x 10-9

 

1.0 x 10-9

 

 

AND

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

10

 

11

 

12

 

 

 

 

 

 

Hose disconnection

 

Driver fail to rectify the problem

 

Vehicle drives away

 

Staff fail to rectify the problem

 

 

 

 

 

 

2 x 10-6

 

0.2

 

4 x 10-6

 

0.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Figure A8-10      Failure to Prevent BLEVE

1

 

 

 

 

 

 

 

 

 

 

 

 

Failure to prevent BLEVE

 

 

 

 

 

 

 

 

 

 

 

 

0.025

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

3

 

4

 

 

 

 

 

 

 

 

Water spray system failure

 

Fire service fail to prevent BLEVE

 

Coating failed under jet fire

 

 

 

 

 

 

 

 

0.5

 

0.5

 

0.1

 

 

 

 

 

 

 

 

 

Figure A8-11      Failure to Isolate

1

 

 

 

 

 

 

 

 

 

 

 

 

Failure to isolate

 

 

 

 

 

 

 

 

 

 

 

 

1.7 x 10-7

 

 

 

 

 

 

 

 

 

 

 

 

AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

3

 

4

 

 

 

 

 

 

 

 

Emergency shut-off valve failure

 

Non-return valve failure

 

Excess Flow Valve failure

 

 

 

 

 

 

 

 

1 x 10-4

 

0.013

 

0.13